Mr. Siripong Nakthong

Photo  Mr_Siripong_Nakthong
Name Mr. Siripong Nakthong
Current Job title/
company/organization
MANAGING DIRECTOR1D2 Group Co., Ltd. (BANGKOK)
Specialty Consultant in Design & Construction of Underground Infrastructures for Mass Transport, Railways.
Contact Address Thailand 218/22 Rom Klao Road, Khlong Sam Pravet, Ladkrabang, 10520 Bangkok
Email siripong.nakthong@gmail.com
Brief Description Master of Engineering (M.Eng) in Civil Engineering, 2009(Geotechnical Engineering)

King Mongkut’s Institute of Technology Ladkrabang (KMITL)

Bachelor of Engineering (B.Eng.) in Civil Engineering, 2004

King Mongkut’s Institute of Technology Ladkrabang (KMITL)

2004-2006 Nawarat Pattanakarn Public Company Limited. (Contractor)
Baan San Ploen Project,
Position held: Site engineer, responsibilities in construction buildings and swimming pool.

Construction of Transmission Tunnel from Taksin – Phetkasem Outer Ring Road to Rama II Road and Related Works Under the sixth Bangkok Water Supply Improvement Project (G-TN-6c)

Position held: Site Engineer, responsibilities in construction shaft and tunneling

2006-present:    1D2 Group Co., Ltd / D2 Consult Asia (Consultant)
MRTA Blue Line Extension Project (Design phase)
Position held: Geotechnical engineer, responsibility in design tunnel lining, connection Hua-Lumphong Station, connection Transition structure and Intervention shaft. Additionally, specification documents and cost estimation.

MRTA Purple Line Project (Construction Phase)
Position held: Structural Intermediate engineer, responsibility in review shop drawings, method statement and calculation check for segmental block girder structure

MRTA Blue Line Extension Project (Construction Phase)
Position held: Geotechnical/Tunnel engineer/Company representative, responsibility in review the shop drawing, method statement and calculation regarding the segmental tunnel lining, underground station, connection structure to Hua-Lumphong Station and connection Transition structure

Northeast Doubling Track Project, Mapkabao – Chira (Design phase)
Position held: Tunnel supporting engineer/ Company representative, responsibility in the design the tunnel structures in rock (lime stone).

MRTA Yellow Line (Design Phase)
Position held: Geotechnical engineer/ Company representative, responsibility in design the diaphragm wall, underground structures.

Road Tunnel Project Katoo-Phatong (Design Phase)
Position held: Company representative,
Responsibility in coordinate and assistance in definitive design for the road tunnel including the geological investigation.

Publications/Conferences

– The 12th National Convention on Civil Engineering, Thailand, 2007 “การวิเคราะห์และเปรียบเทียบทฤษฎีที่ใช้ในการออกแบบผนังอุโมงค์ใต้ดินในชั้นดินอ่อน”

– International Conference on Engineering, Applied Sciences, and Technology, Thailand, 2007 “Assessments of lining design methods for soft ground tunneling”

– International Symposium on Tunneling for Urban Development, Thailand, 2007 “Tunnel Lining Design and Evaluation of Bangkok MRTA Blue Line Extension”

– The 13th National Convention on Civil Engineering, Thailand, 2008  “การออกแบบและวิเคราะห์ผนังอุโมงค์โครงการรถไฟฟ้าใต้ดิน ส่วนต่อขยาย            สายสีน้ำเงิน”

– Conference of ASEAN Federation of Engineering Organization (CAFEO26) “Lining Design of Twin Tunnels for the Extension MRTA Project in Bangkok”

– The 14th National Convention on Civil Engineering, Thailand, 2009  “การออกแบบผนังอุโมงค์โครงการรถไฟฟ้าใต้ดินในประเทศไทยและสิงคโปร์”

– The World Tunnel Congress, Budapest, Hungary, 2009 “Design and appraisal of twin tunnels for Bangkok MRTA Extension project”

– Participate in The World Tunnel Congress, Vancouver, Canada, 2010

– Participate in The World Tunnel Congress, Helsinki, Finland, 2011

– Participate in The World Tunnel Congress, Bangkok, Thailand, 2012

– Participate in The World Tunnel Congress, Geneva, Switzerland, 2013

– Participate in The World Tunnel Congress, Iguassu Fall, Brazil, 2014

Leave a Reply

Your email address will not be published.