Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School
Friday January 23, 2015
9.00-12.00 Basic Cost Estimation for Tunneling Works – Mr.Prasert Chantawiboon (Ch. Karnchang PCL)
13.00-16.00
Construction Management, Problems & Obstruction During Construction – Mr.Chawalit Lohseetong (MAA Consultants Co., Ltd.)
Case Study from MWA Project – Mr.Pesadate Tridate (MWA)
Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School.
Thursday January 22, 2015
9.00-12.00 Safety for Modern Railways in Europe
– Decision Making with a Risk-Based Approach – Mr.Florian Diernhofer (ILF Consulting Engineers (Asia) Ltd.)
– Realization of a complex railway project – Safety Standards for Tunnels of the High-Speed Line Vienna – St. Polten/ Austria – Mr.Bernhard Kohl (ILF Consulting Engineers (Asia) Ltd.)
– The Swiss approach to improve the rail network – Mr.Gerhard Schmitz (ILF Consulting Engineers (Asia) Ltd.)
13.00-16.00 Basic Knowledge for Standard, Specification and Contract of Tunneling Works – Dr.Harald Wagner (DHW Ltd.)
Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School.
Wednesday January 21, 2015
9.00-12.00 Railway Tunnel Design , TBM, NATM – Mr.Kobayashi Tetsuhisa (Team Group)
– Project Survey, Investigation, and Planning
– Selection of the Tunnel Scheme
13.00-16.00 Monitoring and Safety for Tunnel Construction – Mr.Jadet Seelasupha (Ch. Karnchang PCL)/Dr.Auttakit Asanprakit (Geotechnical & Foundation Engineering Co.,Ltd.)
– Safety Regulation
– Preventive Measures and Risk Control
– Instrumentation for Underground Works