Dr. Voraniti Chovichien

Photo  Dr_Voraniti_Chovichien
Name Dr. Voraniti Chovichien
Current Job title/
company/organization
Senior Structural Engineer, Project Coordinator, Depot Designer
Asian Engineering Consultant Corp., Ltd.
Specialty Depot Design for MRT Blue Line Extension
Depot Design for BMA Monorail Project
Contact Address Sathorn Thani Building 9 fl. 90/18-90/20 North Sathorn Road, Bang Rak, Bangkok 10900
Email Voraniti.chovichien@gmail.com
Brief Description Feb 2011 – Dec 2013

Document Engineer and Project Coordinator for Consulting Services for Review, Feasibility Study, Designs, Tender Documentation Preparation and Implementation Criteria pursuant to Private–Sector Participation in State Undertakings Act, B.E. 2535 The Purple Line Project: Tao Pun – Rat Burana
Project Coordinator for The Feasibility Studies of Chao Phraya River Crossing and Road Link In the Area of Phra Samut Chedi District, Samut Prakan Province
Project Coordinator for Consulting Services Survey and Detailed Engineering Design of Transborder Road Link Project (Dawei – Phu Nam Ron)


Sep 2008 – Feb 2011

Depot Designer/Project Coordinator for BMA Monorail Project: Bangkok City Hall – Yo Thi Road Line, Ramkhamhaeng – Thong Lo Line and LRT Project: Bang Na – Suvanabhumi Airport Line

Dec 2004-Aug 2008

Building Structure Assistant Manager (Depot and Park & Ride) for Detailed and Definitive Designs and Tender Documentation for Blue Line Extension Project: Hua  Lamphong – Bang  Khae and Bang  Sue – Tha Phra Sections

Structural Engineer for Studied and detailed designed of Commuter and Long Distance Trains Feeder to Mass Rapid Transit Bangkok and Sub-Urban Area (Rangsit – Ban Phachi junction, Makkasan – Chachoengsao, Taling Chan – Nakhon Pathom, and Mahachai – Pak Tho) (4-Lines Project)

Structural Engineer for Studied and preliminary designed of Blue Line Extension Project (Hua Lampong – Bang Khae and Bang Sue – Tha Phra sections)

Structural Engineer and Project Coordinator for Studied and detailed designed of Red Line Rail System Project: Missing Link (Bang Sue – Hua Lumphong and Bang Sue – Makkasan Sections)

Jan 2001-Aug 2004  

Indiana Department of Transportation (INDOT), Indiana ,USA.

Researcher for “Behavior and Design of Piles for Integral Abutment Bridges” Project, Conducted low-cycle, large amplitude lateral displacement pile tests.  Developed design recommendations for typical integral abutment bridges for the Indiana Department of Transportation (INDOT).  Researched bridge and pile in-service behavior.  Installed movement equipments and analyzed the results of Integral Abutment Bridge SR18 over Mississinewa River (Structure #18-27-4518D), Tippecanoe County, Indiana, USA. Bridge length is 111 m. (367 ft)  Installed movement equipments and analyzed the results of Integral Abutment Bridge SR249 over US12 (Structure #12-64-2673), Portage Township, Indiana, USA. Bridge length is 300 m (990 ft)

Leave a Reply