TUNNELING CONCEPT AND TUNNEL CONSTRUCTION MANAGEMENT FOR THAI RAILWAY ON THURSDAY JANUARY 22, 2015

Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School.

Thursday January 22, 2015

9.00-12.00            Safety for Modern Railways in Europe

–               Decision Making with a Risk-Based Approach – Mr.Florian Diernhofer (ILF Consulting Engineers (Asia) Ltd.)

–               Realization of a complex railway project – Safety Standards for Tunnels of the High-Speed Line Vienna – St. Polten/ Austria – Mr.Bernhard Kohl (ILF Consulting Engineers (Asia) Ltd.)

–               The Swiss approach to improve the rail network – Mr.Gerhard Schmitz (ILF Consulting Engineers (Asia) Ltd.)

13.00-16.00 Basic Knowledge for Standard, Specification and Contract of Tunneling Works – Dr.Harald Wagner (DHW Ltd.)

S__2793488

S__2793489

S__2793490

S__2793491

S__2793492

S__6135812

S__6135813

S__6135814

S__6135818

Tunneling Concept and tunnel construction management for Thai Railway on Wednesday January 21, 2015

Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School.
Wednesday January 21, 2015
9.00-12.00 Railway Tunnel Design , TBM, NATM – Mr.Kobayashi Tetsuhisa (Team Group)
– Project Survey, Investigation, and Planning
– Selection of the Tunnel Scheme
13.00-16.00 Monitoring and Safety for Tunnel Construction – Mr.Jadet Seelasupha (Ch. Karnchang PCL)/Dr.Auttakit Asanprakit (Geotechnical & Foundation Engineering Co.,Ltd.)
– Safety Regulation
– Preventive Measures and Risk Control
– Instrumentation for Underground Works

S__6103186

S__6103187

S__6103188

S__6103189

S__6103190

S__6111247

S__6111248

S__6111277

S__6111278

S__6111279

TUNNELING CONCEPT AND TUNNEL CONSTRUCTION MANAGEMENT FOR THAI RAILWAY ON TUESDAY JANUARY 20, 2015

 

Tunneling Concept and tunnel construction management for Thai Railway during Monday 19 January 2015 to Friday 23 January 2015 at SRT Engineering School.
Tuesday January 20, 2015
9.00-12.00 Tunnel Construction Machineries & Equipment and Site Installation
Soft Ground Tunneling – Mr.Somsak Wongwishakorn (KSD PTE LTD.)
Mountain Tunneling – Mr.Chawalit Tanomtin (Right Tunnelling Co.,Ltd.)

13.00-16.00 Constructions of Tunnel Related Structure ; Precast Segment, Shaft, Pipe Roof – Dr.Sopat Vorawiwat (Ch. Karnchang PCL)

 

42065

S__6086814 S__6103096 S__6103099 S__6103100 S__6103101 S__6103102 S__6103135 S__6103136 S__6103137